轨道交通装备制造企业计划排程组件设计和应用研究

Design and Application Research of Production Scheduling Component for Rail Transit Equipment Manufacturing Enterprise

  • 摘要: 制造企业在实际生产过程中,为解决四日滚动计划对个人经验依赖、Excel 表格计划数据无法直接对接MES 和生产信息反馈滞后等难题,设计开发了一套计划排程组件。通过与遗传算法、模拟退火算法等传统优化算法的对比分析,验证了"播种机"算法在混线生产环境下的优越性。经过半年多的实际应用,四日计划制作时间从4h 缩短到1.5h,排程效率提升了60%以上,计划准确率达到95%,为企业数字化转型提供了实用的工具,积累了宝贵经验。

     

    Abstract: In the actual production process of manufacturing enterprises, a production scheduling component was designed and developed to solve the problems of four-day rolling plan's dependence on personal experience, inability of Excel table planning data to directly interface with MES system, and delayed production information feedback. The "seeding machine" scheduling algorithm was adopted, combined with the characteristics of mixed-line production in enterprises, effectively solving key problems such as low scheduling efficiency, data silos, and delayed feedback. Through comparative analysis with traditional optimization algorithms such as genetic algorithm and simulated annealing algorithm, the superiority of the "seeding machine" algorithm in mixed-line production environment was verified. After more than half a year of practical application verification, the four-day plan production time was shortened from 4 hours to 1.5 hours, with efficiency improved to 60% above; the plan accuracy rate increased to 95%, providing practical tools for enterprise digital transformation and accumulating valuable experience.

     

/

返回文章
返回